CBP TPVS 2.0 • Operational Prototype Platform
Interactive operational prototype starting with primary intake and enterprise administration, extensible to challenge-specific operational screens.
Mission-Language Rule Authoring Studio
Primary mission workflow, intake canvas, validation pipeline, and operational rules.
- •Workflow Step 1: Visual Condition Builder & Multi-Modal Criteria
- •Workflow Step 2: Real-Time Logic Linter & AST Parser
- •Workflow Step 3: NIST SP 800-53 Multi-Party Governance Gate
IT Administrator M&C Console & Telemetry
Enterprise monitoring, dynamic policy controls, provider telemetry probes, and resiliency testing.
- •M&C Controls: Staged Canary Traffic Shaping (10% to 100%)
- •Telemetry Probes: Sub-50ms SLR & Latency Compliance Monitoring
- •Chaos & Resiliency: Sub-2s Emergency Attributable Killswitch Rollback
CBP PCCS Business-Rule Authoring & Safe Rollout Suite • Active Challenge Prototype
Rule Studio
Mission-language visual condition builder, multi-modal criteria, AST contradiction linter, NIST SP 800-53.
Impact Simulation
Pre-deploy replay against 100+ synthetic travelers, blast breakdown, +40.9% anomaly detection alert.
Approver Gate
Review rules & blast radius, NIST separation of duties, 'Ready for Deployment' or 'STOP/BLOCK' action.
Governance Rollout
Feature flag staged promotion (Shadow -> Canary 10% -> Prod 100%), sub-2s emergency killswitch (142ms).
CBPO Inspection
Primary booth inspection mockup, side-by-side biometric comparison, clean officer dossier, adjudication.
PWS §5.2 Application Modernization • Stage 1 Rule Authoring
Egress Checkpoint Activation & Camera Stream Controls